Old Suspension Pipeline
|
|
Cyrax used for Condition Assesment of Old Bridge |
 |
 |
 |
|
“The scanned image allowed us to create an accurate as-built of the pipeline bridge for a minimal cost. The new process greatly enhanced the inspection results while reducing the risks associated with physical surveying of the structure.” Larry Catalano, Principal, Farnsworth Group
|
|
 |
|
 |
 |
|
 |
 |
 |
|
|
|
|
|